Page 1 of 1

First VM build

PostPosted: Wed Aug 15, 2012 6:31 pm
by Twat
Think I might have worked out the picture upload thing so here is the start of my VM build.
Making two separate stills, one a dedicated stripper and pot still on gas and the other (inverted keg) Vodka VM on power.
VM head design borrowed heavily from Mini and Myles on AD :handgestures-thumbupleft:
Not sure whether to go 1 inch tee or 2 inch tee in the VM head (opinions please)
Kegs are currently with the welder receiving 4inch ferrules and 2 inch fill ports
Column will be 4>3 reducer at the keg with a 3 inch column in 3 sections (1000mm, 500mm, 500mm)
Condenser will be 2 inch shotgun

Thought I might also share a few things I have discovered since starting this build
* 2 kegs is never enough
* Stainless fittings will breed if left unsupervised on the workbench
* I may have a stainless addiction :oops:
* I can not make my drill variable speed simply by leaning harder on it
* I should not take the safety cover off the angle grinder to use the last bit of cut off wheel
* I can not weild an angle grinder one handed
* I can not cut the rim from a beer keg while holding it between my knees and still expect to have children in the future

Re: First VM build

PostPosted: Wed Aug 15, 2012 6:47 pm
by Cane Toad
Fuck! I need a shed the size of yours mate :handgestures-thumbupleft: :handgestures-thumbupleft: The build looks the goods mate,keep us posted :handgestures-thumbupleft:

Re: First VM build

PostPosted: Wed Aug 15, 2012 7:17 pm
by Kimbo
Yeah baby :dance: :dance:
(shame about the drill) :sad:

Re: First VM build

PostPosted: Wed Aug 15, 2012 7:28 pm
by law-of-ohms
That drill will need plain packaging now

Re: First VM build

PostPosted: Wed Aug 15, 2012 8:41 pm
by Sam.
law-of-ohms wrote:That drill will need plain packaging now


:laughing-rolling: :laughing-rolling: :laughing-rolling: