G'day Guy's,
Well a build thread without some pic's just aint a build thread so lets get things started :laughing-rolling: :laughing-rolling:
the marriage.jpg
The marriage between the kegs is close to completion and went shopping today at the scrapyard.
butterfly valve and new fitting.jpg
Scored this SS 2" butterfly valve and a 1-1/2 BSP threaded adaptor, on the right side with the taper I'll cut it back to suit the 2" pipe and tig weld it. the 1-1/2" adaptor will go in the left hand side. I'll put a quick connector on it for a hose so draining the wash after a run will be a breeze, down the track I'll set it up for filling the boiler too.
2 inch pipe.jpg
Also scored the 90 degree bend 2" pipe and several other for making the legs. Next week at work I'll score some 100x10mm offcut plates to use for the feet.
So the fun begins gluing all this together
Cheers Bryan
You do not have the required permissions to view the files attached to this post.